We decided to build a bungalow on a frame technology. For such a structure we could use a pier foundation that does not require much time and effort, and to erect a frame house with a roof without interior finish you can within a few days.
A project. The family of the builder consists of four people, so the house should have at least three bedrooms, a large guest room, a kitchen, a bathroom with a shower, a large terrace for the evening tea and a dinner in the open air. A typical vacation home for the families with average incomes. We treated very seriously a home construction, because it determines not only a matter of convenience to use at home, but a home price, a technology, a construction and the time at which we can build and make an exterior and interior finishing of the house.
Originally, we planned to make two bay windows, in order the house had as it seemed to us an unusual look. But in the process of working on drawings of frame, we came to the conclusion that without bay windows a period of construction and costs can be significantly reduced, and the house will be warmer and more practical. Based on these conditions and our technical capabilities, we designed the home.
The entrance into the house through a terrace – 13 sq.m, in winter it will serve as a cold vestibule, then we pass into the large heated corridor – 5 sq.m, where a coat rack and a shelf for shoes are placed. From this corridor you can reach my parents' bedroom – 11 sq.m, a toilet 6 sq.m and a kitchen – 18 sq.m. The kitchen is divided into two zones. Near the front door there is a working area with a sink desk, a gas stove, a refrigerator and shelves, further there is a dining area with a large table, a couch and a metal stove, from which you can get into the guest room – 21sq.m, and children's bedrooms - 8.6 sq.m and 10.8 sq.m.
A foundation. Since the house was decided to build a light one-story frame house with a size 11 by 9 meters, the foundation of the house was made from pillars, with asbestos-cement pipes filled with a concrete mortar. To produce such a foundation is very quick, moreover, there is no need to wait for months until the cement is fully cured.
With the help of bore we drilled holes 200 mm in the ground to a depth of about one meter. The distance between the posts is 80-90cm.
We set the cement pipes in the drilled holes with an inner diameter of 100 mm., a length of 1.3 m. We sprinkled the sand around pipes, watered it and rammed it, poured into a tube-mix concrete according to the proportions: a bucket of cement, four buckets of sand and five or six buckets of gravel. In the pipes we installed a special plate for fixing lags. Over two days off we established and filled with a concrete solution 125 tubes.
A framework design. In order to the frame house was strong, and the cost of its construction was minimal, the spans in the rooms must not be longer than the construction of timber (logs or planks), taking into account the thickness of walls. Since the length of a standard board is 6 m., a wall thickness is 170mm, a width is 5,4 - 5,6 m. Based on these requirements, we had to make a load-bearing wall in the middle of the house and move it about the center of house, based on its ceiling beams.