I am continuing to post a spring construction,photoshoot, I have been there this morning, I post pics that rosed before my eyes. The builders have already put the beams on the second floor, I offer the views from the various rooms of the house. Supporting pillars that I chose 200 x 200, while the foreman was offering 150 x 150 – but I didn’t listen to the pros, now, I think they catch the eye, and even if they are changed then, will be a strong trouble?. Help me, please!. But I was upset, but the guys said that the fragment was well matched, and they woild lock it with the screws, drowning caps. well, this part of the axis is located at the rear of the house, but none the less. The winter does not want to give up their rights to spring this year, then the log house is covered, then it is opened with an enviable regularity. The beams were treated with a red antiseptic called “Senezh”, the experience of the builders shows that when it rains and snow, an antiseptic and to lubricate the stain timber itself, or rather the red stains on the walls. When the weather is normal, they will cut the film, and the protruding ends before the treatment of the ends, look at the ends below, there is no PSUL and the ends are processed.