Thanks for the compliments, I am straight embarrassed!. With the floor it is OK. Everything is dry. Where it was very damp, I nailed the OSB bottom up, so it dried better. Oh, and I wrote... A few more pictures from the history of the shield.
Almost everything has already cross-connected.
There is no only a 12V power supply for the diode illumination and a twilight relay. They have the operational testing with measurements of consumption in real combat conditions. Finally, I set the flap in place.
I connected a lighting and a heating circuit in the insulated room.
Then I connect the antenna to the modem. Now, everything works. We are remotely monitoring the temperature regime.
A few photos:
